4.9
By the project manager who runs your job, evenings and weekends included.
They gave us a six-week schedule on day one and handed back the keys on day forty-one. The quote never moved by a dollar.
Priya Raman
Kitchen remodel · Oak Park
When the backsplash tile arrived two weeks late, they resequenced the job around it and still finished on the date in the contract.
Hannah Lindqvist
Kitchen refresh · River Forest
Three contractors gave us a range. Backsplash gave us a number, itemised down to the cabinet pulls, and that is the number we paid.
Sofia Marchetti
Kitchen remodel · La Grange
They found old galvanised pipe behind the wall, showed it to us, priced it in writing that afternoon and kept the finish date.
Tom Whitaker
Hall bath · Berwyn
The dust walls went up before a single tile came off. We cooked dinner in the next room every night of the job.
Daniel Okafor
Primary bath · Evanston
The 3D layout showed us the island was too deep before anything was ordered. That one drawing saved us a change order.
Marcus Bell
Full design-build · Elmhurst
Our project manager texted a photo at four every afternoon. I never once had to ask what had happened that day.
Walter Brandt
Bath refresh · Forest Park
Permits, inspections, the electrician: I signed one page and they handled the rest. The inspector passed it the first time.
Renee Castillo
Kitchen remodel · Brookfield