03 — Homeowners

Ask the peoplewho live in our work.

4.9

380 verified reviews

Every call returned within 24 hours

By the project manager who runs your job, evenings and weekends included.

They gave us a six-week schedule on day one and handed back the keys on day forty-one. The quote never moved by a dollar.

Woman in yellow sweater sitting on grass Priya Raman Kitchen remodel · Oak Park

When the backsplash tile arrived two weeks late, they resequenced the job around it and still finished on the date in the contract.

Smiling blonde woman outdoors at golden sunset Hannah Lindqvist Kitchen refresh · River Forest

They found old galvanised pipe behind the wall, showed it to us, priced it in writing that afternoon and kept the finish date.

Smiling man in a blue shirt Tom Whitaker Hall bath · Berwyn

The dust walls went up before a single tile came off. We cooked dinner in the next room every night of the job.

Smiling young man with folded arms outdoors Daniel Okafor Primary bath · Evanston

The 3D layout showed us the island was too deep before anything was ordered. That one drawing saved us a change order.

Smiling man in a cap on a city street Marcus Bell Full design-build · Elmhurst

Our project manager texted a photo at four every afternoon. I never once had to ask what had happened that day.

Older man with glasses in olive polo shirt Walter Brandt Bath refresh · Forest Park

Permits, inspections, the electrician: I signed one page and they handled the rest. The inspector passed it the first time.

Smiling woman in a denim jacket on the street Renee Castillo Kitchen remodel · Brookfield