Four kinds of job, one crew, and the same daily rhythm on every one of them.
A temporary kitchen goes up in another room on day one, so the family eats at home through all of it. The loud week is planned with you, not sprung on you.
Typical time
6–8 weeks
Typical budget
$45–80k
We finish and hand back each bathroom before we open the next, so there is always a working shower in the house. Most are done inside a month, tile to towel rail.
Typical time
3–4 weeks
Typical budget
$18–35k
The new room is built weather-tight from the outside first, and the opening into your home is cut last. You live with a door-sized hole for days, not months.
Typical time
12–16 weeks
Typical budget
$120–220k
We work the floor in zones and move your furniture with us, so half of it is always yours. The order is agreed on paper before week one and it does not drift.
Typical time
10–14 weeks
Typical budget
$90–160k